Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
37.1%
OF COST SPENT
₹77.78 L spent
of ₹2.09 Cr sanctioned
₹1.32 Cr still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹2.09 Cr
Pure scheme (wage + material)
Expenditure since inception
₹77.78 L
37.1% of sanction
Balance cost (unspent)
₹1.32 Cr
Wage₹68.31 L
Material₹63.34 L