Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
27.4%
OF COST SPENT
₹41.95 L spent
of ₹1.53 Cr sanctioned
₹1.11 Cr still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹1.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹41.95 L
27.4% of sanction
Balance cost (unspent)
₹1.11 Cr
Wage₹46.65 L
Material₹64.79 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh