Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.2%
OF COST SPENT
₹9.52 L spent
of ₹41.30 Cr sanctioned
₹41.21 Cr still to spend
on 140 ongoing works
Works ongoing
140
Open the list of these works →
Sanctioned
₹41.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.52 L
0.2% of sanction
Balance cost (unspent)
₹41.21 Cr
Wage₹21.19 Cr
Material₹20.01 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore