Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Compound wall
69.9%
OF COST SPENT
₹2.50 Cr spent
of ₹3.58 Cr sanctioned
₹1.08 Cr still to spend
on 27 ongoing works
Works ongoing
27
Open the list of these works →
Sanctioned
₹3.58 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.50 Cr
69.9% of sanction
Balance cost (unspent)
₹1.08 Cr
Wage₹11.33 L
Material₹96.67 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore