Data as of 16 Oct 2026, 08:36 Admin login
FY
Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
40.6%
OF COST SPENT
₹3.87 Cr spent
of ₹9.53 Cr sanctioned
₹5.66 Cr still to spend
on 258 ongoing works
Works ongoing
258
Open the list of these works →
Sanctioned
₹9.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.87 Cr
40.6% of sanction
Balance cost (unspent)
₹5.66 Cr
Wage₹3.39 Cr
Material₹2.27 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore