Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
12.2%
OF COST SPENT
₹14.84 L spent
of ₹1.21 Cr sanctioned
₹1.06 Cr still to spend
on 36 ongoing works
Works ongoing
36
Open the list of these works →
Sanctioned
₹1.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹14.84 L
12.2% of sanction
Balance cost (unspent)
₹1.06 Cr
Wage₹77.23 L
Material₹29.18 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh