Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
49.9%
OF COST SPENT
₹12.93 L spent
of ₹25.93 L sanctioned
₹13.00 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹25.93 L
Pure scheme (wage + material)
Expenditure since inception
₹12.93 L
49.9% of sanction
Balance cost (unspent)
₹13.00 L
Wage₹5.09 L
Material₹7.91 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh