Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.2%
OF COST SPENT
₹4.23 L spent
of ₹16.95 Cr sanctioned
₹16.91 Cr still to spend
on 108 ongoing works
Works ongoing
108
Open the list of these works →
Sanctioned
₹16.95 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.23 L
0.2% of sanction
Balance cost (unspent)
₹16.91 Cr
Wage₹8.54 Cr
Material₹8.37 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Burhanpur — Khaknar ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore