Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
24%
OF COST SPENT
₹9.13 L spent
of ₹38.02 L sanctioned
₹28.88 L still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹38.02 L
Pure scheme (wage + material)
Expenditure since inception
₹9.13 L
24% of sanction
Balance cost (unspent)
₹28.88 L
Wage₹18.25 L
Material₹10.63 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh