Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
38%
OF COST SPENT
₹8.93 Cr spent
of ₹23.50 Cr sanctioned
₹14.57 Cr still to spend
on 852 ongoing works
Works ongoing
852
Open the list of these works →
Sanctioned
₹23.50 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.93 Cr
38% of sanction
Balance cost (unspent)
₹14.57 Cr
Wage₹4.58 Cr
Material₹9.98 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore