Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
37.1%
OF COST SPENT
₹2.23 L spent
of ₹6.02 L sanctioned
₹3.79 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹6.02 L
Pure scheme (wage + material)
Expenditure since inception
₹2.23 L
37.1% of sanction
Balance cost (unspent)
₹3.79 L
Wage₹3.17 L
Material₹62,229
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh