Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.3%
OF COST SPENT
₹51,900 spent
of ₹1.55 Cr sanctioned
₹1.54 Cr still to spend
on 60 ongoing works
Works ongoing
60
Open the list of these works →
Sanctioned
₹1.55 Cr
Pure scheme (wage + material)
Expenditure since inception
₹51,900
0.3% of sanction
Balance cost (unspent)
₹1.54 Cr
Wage₹62.00 L
Material₹92.30 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore