Data as of 29 Oct 2026, 07:04 Admin login
FY
Reset

Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
8.3%
OF COST SPENT
₹3.22 L spent
of ₹39.07 L sanctioned
₹35.84 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹39.07 L
Pure scheme (wage + material)
Expenditure since inception
₹3.22 L
8.3% of sanction
Balance cost (unspent)
₹35.84 L
Wage₹2.36 L
Material₹33.48 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

No works match these filters.