Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Crematorium
2.4%
OF COST SPENT
₹2.96 L spent
of ₹1.24 Cr sanctioned
₹1.21 Cr still to spend
on 48 ongoing works
Works ongoing
48
Open the list of these works →
Sanctioned
₹1.24 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.96 L
2.4% of sanction
Balance cost (unspent)
₹1.21 Cr
Wage₹18.27 L
Material₹1.03 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh