Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of NADEP/Vermi Compost Pit
0.3%
OF COST SPENT
₹27,653 spent
of ₹1.08 Cr sanctioned
₹1.08 Cr still to spend
on 108 ongoing works
Works ongoing
108
Open the list of these works →
Sanctioned
₹1.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹27,653
0.3% of sanction
Balance cost (unspent)
₹1.08 Cr
Wage₹17.28 L
Material₹90.36 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost