Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Embankment
0.8%
OF COST SPENT
₹19.06 L spent
of ₹23.30 Cr sanctioned
₹23.11 Cr still to spend
on 253 ongoing works
Works ongoing
253
Open the list of these works →
Sanctioned
₹23.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹19.06 L
0.8% of sanction
Balance cost (unspent)
₹23.11 Cr
Wage₹13.13 Cr
Material₹9.98 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore