Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Gabion
35.2%
OF COST SPENT
₹15.63 L spent
of ₹44.34 L sanctioned
₹28.71 L still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹44.34 L
Pure scheme (wage + material)
Expenditure since inception
₹15.63 L
35.2% of sanction
Balance cost (unspent)
₹28.71 L
Wage₹5.13 L
Material₹23.58 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block