Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
53.2%
OF COST SPENT
₹8.90 Cr spent
of ₹16.73 Cr sanctioned
₹7.83 Cr still to spend
on 528 ongoing works
Works ongoing
528
Open the list of these works →
Sanctioned
₹16.73 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.90 Cr
53.2% of sanction
Balance cost (unspent)
₹7.83 Cr
Wage₹1.80 Cr
Material₹6.03 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore