Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
77.4%
OF COST SPENT
₹7.87 Cr spent
of ₹10.17 Cr sanctioned
₹2.30 Cr still to spend
on 127 ongoing works
Works ongoing
127
Open the list of these works →
Sanctioned
₹10.17 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.87 Cr
77.4% of sanction
Balance cost (unspent)
₹2.30 Cr
Wage₹1.54 Cr
Material₹76.02 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore