Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
32.9%
OF COST SPENT
₹1.98 Cr spent
of ₹6.01 Cr sanctioned
₹4.03 Cr still to spend
on 93 ongoing works
Works ongoing
93
Open the list of these works →
Sanctioned
₹6.01 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.98 Cr
32.9% of sanction
Balance cost (unspent)
₹4.03 Cr
Wage₹2.67 Cr
Material₹1.36 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore