Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
50.5%
OF COST SPENT
₹4.02 Cr spent
of ₹7.96 Cr sanctioned
₹3.94 Cr still to spend
on 39 ongoing works
Works ongoing
39
Open the list of these works →
Sanctioned
₹7.96 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.02 Cr
50.5% of sanction
Balance cost (unspent)
₹3.94 Cr
Wage₹89.57 L
Material₹3.04 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost