Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
0.1%
OF COST SPENT
₹1,224 spent
of ₹20.72 L sanctioned
₹20.71 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹20.72 L
Pure scheme (wage + material)
Expenditure since inception
₹1,224
0.1% of sanction
Balance cost (unspent)
₹20.71 L
Wage₹15.46 L
Material₹5.25 L