Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
52.2%
OF COST SPENT
₹1.86 Cr spent
of ₹3.57 Cr sanctioned
₹1.71 Cr still to spend
on 84 ongoing works
Works ongoing
84
Open the list of these works →
Sanctioned
₹3.57 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.86 Cr
52.2% of sanction
Balance cost (unspent)
₹1.71 Cr
Wage₹1.09 Cr
Material₹61.44 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore