Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
1.1%
OF COST SPENT
₹9.27 L spent
of ₹8.71 Cr sanctioned
₹8.62 Cr still to spend
on 350 ongoing works
Works ongoing
350
Open the list of these works →
Sanctioned
₹8.71 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.27 L
1.1% of sanction
Balance cost (unspent)
₹8.62 Cr
Wage₹6.46 Cr
Material₹2.16 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore