Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
32.9%
OF COST SPENT
₹3.98 Cr spent
of ₹12.10 Cr sanctioned
₹8.12 Cr still to spend
on 184 ongoing works
Works ongoing
184
Open the list of these works →
Sanctioned
₹12.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.98 Cr
32.9% of sanction
Balance cost (unspent)
₹8.12 Cr
Wage₹4.01 Cr
Material₹4.11 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore