Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
60.1%
OF COST SPENT
₹5.42 Cr spent
of ₹9.02 Cr sanctioned
₹3.60 Cr still to spend
on 35 ongoing works
Works ongoing
35
Open the list of these works →
Sanctioned
₹9.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.42 Cr
60.1% of sanction
Balance cost (unspent)
₹3.60 Cr
Wage₹89.24 L
Material₹2.71 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore