Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of NADEP/Vermi Compost Pit
63.1%
OF COST SPENT
₹17.82 L spent
of ₹28.24 L sanctioned
₹10.41 L still to spend
on 29 ongoing works
Works ongoing
29
Open the list of these works →
Sanctioned
₹28.24 L
Pure scheme (wage + material)
Expenditure since inception
₹17.82 L
63.1% of sanction
Balance cost (unspent)
₹10.41 L
Wage₹3.75 L
Material₹6.67 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh