Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
1.1%
OF COST SPENT
₹17.40 L spent
of ₹15.76 Cr sanctioned
₹15.58 Cr still to spend
on 561 ongoing works
Works ongoing
561
Open the list of these works →
Sanctioned
₹15.76 Cr
Pure scheme (wage + material)
Expenditure since inception
₹17.40 L
1.1% of sanction
Balance cost (unspent)
₹15.58 Cr
Wage₹9.27 Cr
Material₹6.31 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh