Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
26.2%
OF COST SPENT
₹49.98 L spent
of ₹1.91 Cr sanctioned
₹1.41 Cr still to spend
on 93 ongoing works
Works ongoing
93
Open the list of these works →
Sanctioned
₹1.91 Cr
Pure scheme (wage + material)
Expenditure since inception
₹49.98 L
26.2% of sanction
Balance cost (unspent)
₹1.41 Cr
Wage₹98.97 L
Material₹41.88 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore