Data as of 29 Oct 2026, 07:04 Admin login
FY
Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
31.4%
OF COST SPENT
₹2.19 Cr spent
of ₹6.98 Cr sanctioned
₹4.79 Cr still to spend
on 94 ongoing works
Works ongoing
94
Open the list of these works →
Sanctioned
₹6.98 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.19 Cr
31.4% of sanction
Balance cost (unspent)
₹4.79 Cr
Wage₹3.86 Cr
Material₹92.67 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore