Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Crematorium
60.2%
OF COST SPENT
₹12.63 L spent
of ₹20.97 L sanctioned
₹8.34 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹20.97 L
Pure scheme (wage + material)
Expenditure since inception
₹12.63 L
60.2% of sanction
Balance cost (unspent)
₹8.34 L
Wage₹93,226
Material₹7.41 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh