Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
1%
OF COST SPENT
₹7.25 L spent
of ₹7.61 Cr sanctioned
₹7.54 Cr still to spend
on 269 ongoing works
Works ongoing
269
Open the list of these works →
Sanctioned
₹7.61 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.25 L
1% of sanction
Balance cost (unspent)
₹7.54 Cr
Wage₹3.38 Cr
Material₹4.17 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore