Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
74.1%
OF COST SPENT
₹7.75 Cr spent
of ₹10.47 Cr sanctioned
₹2.71 Cr still to spend
on 64 ongoing works
Works ongoing
64
Open the list of these works →
Sanctioned
₹10.47 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.75 Cr
74.1% of sanction
Balance cost (unspent)
₹2.71 Cr
Wage₹51.03 L
Material₹2.20 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost