Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
7.7%
OF COST SPENT
₹3.04 L spent
of ₹39.74 L sanctioned
₹36.70 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹39.74 L
Pure scheme (wage + material)
Expenditure since inception
₹3.04 L
7.7% of sanction
Balance cost (unspent)
₹36.70 L
Wage₹8.89 L
Material₹27.81 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh