Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGPoultry Shelter
69.4%
OF COST SPENT
₹1.12 Cr spent
of ₹1.61 Cr sanctioned
₹49.34 L still to spend
on 81 ongoing works
Works ongoing
81
Open the list of these works →
Sanctioned
₹1.61 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.12 Cr
69.4% of sanction
Balance cost (unspent)
₹49.34 L
Wage₹6.45 L
Material₹42.89 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh