Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
50.6%
OF COST SPENT
₹1.44 Cr spent
of ₹2.84 Cr sanctioned
₹1.40 Cr still to spend
on 55 ongoing works
Works ongoing
55
Open the list of these works →
Sanctioned
₹2.84 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.44 Cr
50.6% of sanction
Balance cost (unspent)
₹1.40 Cr
Wage₹37.19 L
Material₹1.03 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh