Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
51%
OF COST SPENT
₹8.49 L spent
of ₹16.65 L sanctioned
₹8.16 L still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹16.65 L
Pure scheme (wage + material)
Expenditure since inception
₹8.49 L
51% of sanction
Balance cost (unspent)
₹8.16 L
Wage₹4.64 L
Material₹3.53 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh