Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
101.3%
OF COST SPENT
₹10.06 L spent
of ₹9.93 L sanctioned
−₹13,247 still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹9.93 L
Pure scheme (wage + material)
Expenditure since inception
₹10.06 L
101.3% of sanction
Balance cost (unspent)
−₹13,247
Wage−₹42,818
Material₹29,571
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown