Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Canal
47%
OF COST SPENT
₹5.67 L spent
of ₹12.06 L sanctioned
₹6.39 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹12.06 L
Pure scheme (wage + material)
Expenditure since inception
₹5.67 L
47% of sanction
Balance cost (unspent)
₹6.39 L
Wage₹1.12 L
Material₹5.27 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh