Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Gabion
0.2%
OF COST SPENT
₹18,055 spent
of ₹1.20 Cr sanctioned
₹1.20 Cr still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹1.20 Cr
Pure scheme (wage + material)
Expenditure since inception
₹18,055
0.2% of sanction
Balance cost (unspent)
₹1.20 Cr
Wage₹27.41 L
Material₹92.58 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore