Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
0.3%
OF COST SPENT
₹70.97 L spent
of ₹227.66 Cr sanctioned
₹226.95 Cr still to spend
on 7,644 ongoing works
Works ongoing
7,644
Open the list of these works →
Sanctioned
₹227.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹70.97 L
0.3% of sanction
Balance cost (unspent)
₹226.95 Cr
Wage₹122.73 Cr
Material₹104.22 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type