Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.2%
OF COST SPENT
₹78,000 spent
of ₹3.66 Cr sanctioned
₹3.65 Cr still to spend
on 76 ongoing works
Works ongoing
76
Open the list of these works →
Sanctioned
₹3.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹78,000
0.2% of sanction
Balance cost (unspent)
₹3.65 Cr
Wage₹2.02 Cr
Material₹1.63 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown