Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
27.8%
OF COST SPENT
₹27.06 L spent
of ₹97.44 L sanctioned
₹70.38 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹97.44 L
Pure scheme (wage + material)
Expenditure since inception
₹27.06 L
27.8% of sanction
Balance cost (unspent)
₹70.38 L
Wage₹52.88 L
Material₹17.51 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh