Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
20.9%
OF COST SPENT
₹1.21 Cr spent
of ₹5.79 Cr sanctioned
₹4.58 Cr still to spend
on 92 ongoing works
Works ongoing
92
Open the list of these works →
Sanctioned
₹5.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.21 Cr
20.9% of sanction
Balance cost (unspent)
₹4.58 Cr
Wage₹2.03 Cr
Material₹2.56 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore