Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
22.7%
OF COST SPENT
₹1.10 L spent
of ₹4.86 L sanctioned
₹3.75 L still to spend
on 5 ongoing works
Works ongoing
5
Open the list of these works →
Sanctioned
₹4.86 L
Pure scheme (wage + material)
Expenditure since inception
₹1.10 L
22.7% of sanction
Balance cost (unspent)
₹3.75 L
Wage₹2.23 L
Material₹1.53 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district