Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
56.2%
OF COST SPENT
₹3.59 Cr spent
of ₹6.39 Cr sanctioned
₹2.80 Cr still to spend
on 60 ongoing works
Works ongoing
60
Open the list of these works →
Sanctioned
₹6.39 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.59 Cr
56.2% of sanction
Balance cost (unspent)
₹2.80 Cr
Wage₹65.15 L
Material₹2.15 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore