Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
56.3%
OF COST SPENT
₹1.26 Cr spent
of ₹2.23 Cr sanctioned
₹97.34 L still to spend
on 15 ongoing works
Works ongoing
15
Open the list of these works →
Sanctioned
₹2.23 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.26 Cr
56.3% of sanction
Balance cost (unspent)
₹97.34 L
Wage₹78.51 L
Material₹18.83 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore