Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
34.8%
OF COST SPENT
₹1.32 Cr spent
of ₹3.79 Cr sanctioned
₹2.47 Cr still to spend
on 131 ongoing works
Works ongoing
131
Open the list of these works →
Sanctioned
₹3.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.32 Cr
34.8% of sanction
Balance cost (unspent)
₹2.47 Cr
Wage₹64.14 L
Material₹1.83 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore