Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
0.2%
OF COST SPENT
₹29,809 spent
of ₹1.45 Cr sanctioned
₹1.45 Cr still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹1.45 Cr
Pure scheme (wage + material)
Expenditure since inception
₹29,809
0.2% of sanction
Balance cost (unspent)
₹1.45 Cr
Wage₹1.12 Cr
Material₹33.52 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore