Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
28.6%
OF COST SPENT
₹17.43 L spent
of ₹61.00 L sanctioned
₹43.58 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹61.00 L
Pure scheme (wage + material)
Expenditure since inception
₹17.43 L
28.6% of sanction
Balance cost (unspent)
₹43.58 L
Wage₹19.26 L
Material₹24.32 L